To view a PDF of the exhibit, please click the link on the exhibit number (i.e. D-1-1) or the Attachment.
|
Determining Resource Requirements
|
|
|
D-1-1
|
Load Forecast
current version 071019 - replaces original
|
Attachment 1 |
IPSP Reference Forecast Methodology
|
|
Attachment 2
|
IPSP Reference Forecast Assumptions and Results
|
|
Attachment 3
|
Demand Side Management Potential in Canada: Energy Efficiency Study - M.K. Jaccard & Associates Ltd. and Marbek Resource Consultants Ltd. - May 2006
|
|
Attachment 4
|
Developing System Load Profiles and Peak Demand Estimates. - Navigant Consulting Inc. - July 6, 2006
|
|
|
|
D-2-1
|
Planning Reserve Requirements
current version 080505 replaces version 071019 and original
|
Attachment 1
|
IESO Report on Ontario Reserve Requirements to Meet NPCC Criteria
current version 071019 - replaces original
|
|
Attachment 2
|
Coal–Fired Generation Required for System Adequacy and Insurance 2008 – 2014
current version 080505 replaces version 071019 and original
|
|
Attachment 3
|
Determination of Planning Reserve Requirements 2015 – 2027
current version 080505 replaces version 071019 and original
|
|
|
|
D-3-1
|
Determining Resource Requirements: Base, Intermediate and Peaking Requirements
current version 071019 - replaces original
|
Attachment 1 |
Economic Analysis of Gas–Fired and Nuclear Generation Resources
current version 071019 - replaces original
|
|
Attachment 2
|
NCI Report – Evaluation of Costs of New Entry
|
|
Attachment 3
|
Implications of Uranium Price Increase
|
|
Attachment 4
|
Comparison of Natural Gas Price Forecasts
|
|
|
|
Meeting Resource Requirements
|
|
|
D-4-1
|
Conservation Resources
current version 071019 - replaces original
|
Attachment 1 |
Conservation Specific Ministerial Directives
|
|
Attachment 2
|
Meeting the 2007 Target
|
|
Attachment 3
|
Evaluating the Cost Effectiveness of the Conservation Resources Proposed in the IPSP
current version 071019 - replaces original
|
|
Attachment 4
|
Conservation Potential Estimate Details
current version 071019 - replaces original
|
|
Attachment 5
|
Overview of the Portfolio Screening Model, Navigant Consulting Ltd., December 2005.
|
|
Attachment 6
|
Modeling and Scenario Documentation - M.K. Jaccard and Associates, Inc. - September 6, 2006
|
|
Attachment 7
|
Large Office and Retail Market Opportunity Assessment – Marbek Resource Consultants Ltd. – December 22, 2005
|
|
Attachment 8
|
Market Profile And Conservation Opportunity Assessment for Large Industrial Operations In Ontario - Kinectrics Inc. - June 6, 2006
|
|
Attachment 9
|
Market Profile and Conservation Opportunity Assessment for Small & Medium-Sized Industry in Ontario – Altec Environmental Consulting with Marbek Resource Consultants Ltd. – September 2006
|
|
Attachment 10
|
Market Profile and Conservation Opportunity Assessment for Small Businesses – Marbek Resource Consultants Ltd. and Summerhill Group – May 30, 2006
|
|
Attachment 11
|
Market Profiles & Conservation Opportunities Assessment for Agricultural Operations in Ontario – Agviro Ltd. – April 28, 2006
|
|
Attachment 12
|
Potential For Fuel Switching To Reduce Ontario’s Peak Electricity Demand - Marbek Resource Consultants Ltd. and ALTECH Environmental Consulting - Final Report – September 2006
|
|
Attachment 13
|
Potential for Fuel Switching to Reduce Ontario’s Peak Electricity Demand – Analysis of Summer Versus Off‑Summer Energy Savings, and Costs to Achieve Savings, Marbek Resource Consultants Ltd. – Final Report – October 2006
|
|
Attachment 14
|
Assessment of Conservation and Demand Management Supply Chain Capability in Ontario, London Economics, (date)
|
|
Attachment 15
|
Avoided Cost Analysis for the Evaluation of CDM Measures, Navigant Consulting Ltd., June 14, 2005.
|
|
|
|
D-5-1
|
Renewable Resources
current version 080904 replaces version 080829, 080505, 071019 and original
|
Attachment 1 |
Helimax Study – Analysis of Future Wind Farm Development in Ontario
|
|
Attachment 2
|
GE Energy Report on Ontario Wind Integration Study
|
|
Attachment 3
|
AWS Truewind Report on Wind Generation Data
|
|
Attachment 4
|
Calculation of Capacity Contribution of Wind and Hydro
current version 071019 - replaces original
|
|
Attachment 5
|
Bioenergy Resources
|
|
|
|
D-5-2
|
Supplemental Evidence – Offshore Wind and Corrections to Conservation and Supply Resources Evidence
Filed 080505
|
Attachment 1 |
Helimax Report – Analysis of Future Offshore Wind Farm Development in Ontario
|
|
|
|
D-6-1
|
Nuclear Resources for Baseload
current version 080829 replaces version 071019 and original
|
|
|
D-7-1
|
Replacing Coal-Fired Resources
current version 071019 - replaces original
|
|
|
D-8-1
|
Natural Gas-Fired Resources
current version 080505 replaces original
|
Attachment 1 |
Discussion of the Ongoing Requirement for the Availability of the Lennox Generating Station and the Cost Effectiveness of Alternatives
|
|
|
|
D-9-1
|
Meeting Resource Requirements
current version 071019 - replaces original
|
|
|
D-10-1
|
IPSP Authorized Procurements
current version 080829 replaces original
|
|
|
|
|
|