IPSP Stakeholder Consultations
The Ontario Power Authority has undertaken a number of consultation sessions in the development of the 2011 Integrated Power System Plan.
Session Archives
Below are links to the archives for each of the sessions. The corresponding presentations can be found in the Downloads section of this page. Summaries for each of the sessions are also posted below.
May 17 – 2011 IPSP Launch Web-Enabled Teleconference - IPSP Consultation Process and IPSP Planning and Consultation Overview
IPSP May17 Summary
May 25 – IPSP Planning and Consultation Overview and Load Forecast
IPSP May 25 Summary
May 26 – Conservation
May 31 – Supply and Transmission
The IPSP submission period has now closed.